GP
Geometric power
Project Developer / IPP · Nigeria
Geometric Power is a Nigerian power infrastructure company focused on electricity generation and distribution. The company developed the Aba Integrated Power Project (188 MW) in Abia State, designed to supply electricity to the Aba industrial cluster through a dedicated distribution network. The power plant reached operational status in 2024, representing one of Nigeria’s first integrated generation and distribution projects.